Reports & Studies

Note: Some of these reports and studies may not be in an accessible format. If you have difficulty accessing this information, please contact Ann Calvert at 612-673-5023.

Architecture/History Evaluation (2017)

Preliminary Geotechnical Evaluation Report (2016)

Phase I Environmental Site Assessment (2015)

Phase II Environmental Site Assessment (2015)

Hazardous Building Materials Assessment (2015)

Existing UHT Structures Study (2015)

Upper Harbor Terminal Technical Analysis Study (2014)

FAQ Summary of 2014 Study (2014)

Above the Falls Master Plan Update (2013)

Above the Falls Regional Park Plan (2013 draft)

Background on Above the Falls Plans and Planning Processes

Upper Mississippi Harbor Development Architectural/Historical Survey Report (2007)